WE OFFER 24/7 NATIONWIDE COVERAGE

CALL OUR TEAM NOW: 0800 230 0215

QUICK

ENQUIRY

LOCATION:   Kettering

SECTOR:          Petroleum

PERIOD:           3 nights

| BP GARAGE, KETTERING

DRAINAGE     |     SURFACING     |     LINE MARKING

The client initially employed us to carry out some minor asphalt repair works in the HGV fuel filling area of the service station. Prior to commencing these works our highly-experienced surveyors visited the site and identified further areas that required urgent attention due to subsided, defective, and failed surfacing.

CONTACT US

CALL OUR TEAM ON 0800 230 0215

| OBJECTIVE

 

A meeting with BP’s Asset and Project Management Team was requested where a revised scope of works was agreed. NMC surfacing worked closely with the client to ensure that their revised budget was met without any detriment to the overall project requirements.

 

| DELIVERY

 

This project comprised of deep excavation, the installation of concrete kerbs, and heavy duty inspection and drainage covers. The resurfacing works included planning on the existing issue, relaying base, binder and surface course, full site clearance, and line marking.

 

NMC Surfacing provided a Traffic Management Plan which involved the closure of a lane on the A14 and the slip road leading into the service station. Due to some of the repairs being deemed high risk to public health and safety, NMC Surfacing negotiated a three-day emergency road closure with the Local Authorities and Highways England.

 

NMC Surfacing scored 100% from BP’s HSSE auditor who was present on site monitoring the project throughout its progression.

 

| Scotland

 

20-23 Woodside Place,

Glasgow, G3 7QF

 

0141 5821288

| South-West

 

Lower Castle Street,

Bristol, BS1 3AG

 

0117 3131517

OUR LOCATIONS

| London

 

85 Tottenham Court Rd,

London, W1T 4DU

 

0207 2683077

| Central

 

3 Ebor Court,

Doncaster, DN6 7FE

 

01302 275122

| South-East

 

11 Gateway 1000,

Stevenage, SG1 2FP

 

01438 742122