SECTOR:          Retail

PERIOD:          3 nights

| IKEA LAKESIDE, WEST THURROCK

Our client had identified surface failures in the pick-up/collection area of the car park at their busy store. These failures extended onto the main access road and were creating potential health and safety issues.

CONTACT US

CALL OUR TEAM ON 0800 230 0215

| OBJECTIVE

 

During the pre-start meeting our client mentioned they had become aware that the design of the car park allowed drivers to cut diagonally across a pedestrian crossing causing a health and safety concern for the public. It was suggested by NMC that bollards be installed that would force the traffic to use the correct route and avoid potential accidents. It was also recommended that several areas of marking should be refreshed.

 

 

| DELIVERY

 

To minimise disruption and protect trading levels the project was phased over three nights. Barricades were erected around the affected area and a full-time traffic management crew were on site.

 

An area of 2,279m2 was planed out which resulted in 210 ton of excavated material being removed from site to a designated tip. A tanker-applied tac coat was used prior to the surface course being laid.

 

The resurfaced area was machine laid and compacted. All joints were over banded with hot bitumen. All road and safety markings were relined. The job was successfully completed within the agreed timeframe and the client was extremely pleased with the finished project.

| Scotland

 

20-23 Woodside Place,

Glasgow, G3 7QF

 

0141 5821288

| South-West

 

Lower Castle Street,

Bristol, BS1 3AG

 

0117 3131517

OUR LOCATIONS

| London

 

85 Tottenham Court Rd,

London, W1T 4DU

 

0207 2683077

| Central

 

3 Ebor Court,

Doncaster, DN6 7FE

 

01302 275122

| South-East

 

11 Gateway 1000,

Stevenage, SG1 2FP

 

01438 742122